My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: winter erosion control
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2100 Shadywood Road - 17-117-23-31-0041
>
Correspondence
>
Re: winter erosion control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:36:25 PM
Creation date
9/19/2018 9:44:52 AM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
Shadywood
Street Type
Road
Address
2100 Shadywood Road
Document Type
Correspondence
PIN
1711723310041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Silt fence or an approved perimeter control device shall be installed to control , <br /> runoff <br /> ■ Soil stockpiles should be eliminated or consolidated to the extent as possible and be � <br /> protected with perimeter control and mulch applied on all stockpiles that will remain <br /> dormant for the winter months. <br /> ■ Storm Sewer inlet protection including curb and gutter catch basins, parking <br /> lot/road drains, and backyard drop inlets must be: <br /> o Maintained in a manner where all removal of sediment and debris, repairs as <br /> necessary, and or replacement are completed by November 26�', 2009. <br /> Sediment shall be removed when occupying greater than 1/3 the volume of the <br /> device, placed in an upland area and stabilized. <br /> o All "in-structure" and "on-structure devices shall be removed from the storm <br /> sewer inlets by November 26�', 2009 and re-installed in the storm sewer inlets <br /> by April l, 2010. <br /> BMP installation, such as silt fence,has a tendency to be more costly to install during the winter <br /> months therefore it is recommended that all installation occur prior to the ground freezing on <br /> sites where work is proposed to be done during the winter months. Regular construction site <br /> inspection will occur throughout the winter months, and compliance with the Minnesota <br /> Pollution Control Agency(MPCA) construction site general permit and the City Land <br /> Disturbance Permit will be expected. <br /> If you have any questions regarding these construction site winterization issues, please feel free <br /> to contact me at 651-325-6860. Thank you for your cooperation in preserving the surrounding <br /> natural resources within the City of Orono. <br /> Chad Johnson, CPESC <br /> Te1651-604-4939 <br /> Ce11651-325-6860 <br /> chad.j ohnson@bonestroo.com <br /> ����"t�S�t�Da <br /> 2335 Highway 36 W <br /> St. Paul, MN 55113 <br /> Te1651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.