My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: winter erosion control
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2100 Shadywood Road - 17-117-23-31-0041
>
Correspondence
>
Re: winter erosion control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:36:25 PM
Creation date
9/19/2018 9:44:52 AM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
Shadywood
Street Type
Road
Address
2100 Shadywood Road
Document Type
Correspondence
PIN
1711723310041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ,r;;0���0�` : <br /> �; �� � ��, Bonestroo <br /> . � ;�� ����: � <br /> :<< � � � <br /> ; <br /> �, ,s,:,-��� G�„ <br /> `\\��sx�°`'��, <br /> November 13, 2009 <br /> David Schell <br /> 46 Mounds Boulevard <br /> St. Paul MN 55106 <br /> RE: Permit 2009-00249 - 2100 Shadywood Road <br /> The active summer construction season is fast drawing to a close here in the state of winter and <br /> frozen ground. As we move into a new season it is important we take the proper precautions on <br /> our active sites to help eliminate any erosion problems or added expenses that may be incurred <br /> due to winter freeze thaw events and the inevitable spring runoff. As construction continues <br /> throughout the winter in the City of Orono it is important to minimize the amount of open soil by <br /> providing temporary or permanent cover, one of the key elements in preventing soil loss. It is <br /> also required that the appropriate BMPs be maintained on-site by December 1, 2009 as follows: <br /> ■ Exposed soil areas must be stabilized with the appropriate seed mix and erosion <br /> control blanket, disc anchored mulch applied at a rate of 2 tons per acre or other <br /> effective means to control erosion. <br /> o Areas requiring stabilization will include but are not limited to small <br /> miscellaneous areas, landscaping areas, sidewalk backfill, non-active <br /> stockpiles, finished grading areas, etc. <br /> o Areas being worked after November 26th must be stabilized weekly until <br /> construction ends. <br /> o In the event that it snows and there are frozen ground conditions,mulch can <br /> be applied effectively over the snow. <br /> ■ Seeding must be completed with the appropriate seed mix as indicated below. <br /> Dormant seeding shall be done in the later fall after the soil temperature is <br /> consistently below 50 degrees Fahrenheit. Seeding done before or after the indicated <br /> seed dates may require reseeding if the seed does not take. In the event that it snows <br /> and there are frozen ground conditions, seed can be applied effectively over the snow. <br /> Fall and Dormant Seedin Dates <br /> Seed Mixture Number Fall Dormant Seedin <br /> 100 Aug. 1 —Oct. Oct. 20—Dec. 1 <br /> 1 <br /> 150, 190 July 20—Oct. Oct. 20 - Dec. 1 <br /> 20 <br /> 240,250,260,270 July 20— Oct. 20—Dec. 1 <br /> Sept. 20 <br /> 310, 325,328, 330, Sept. 20— Oct. 20—Dec. 1 <br /> 340,350 Oct. 20 <br /> ■ Rock construction entrances to access the construction site and prevent tracking <br /> sediment off site <br />
The URL can be used to link to this page
Your browser does not support the video tag.