Laserfiche WebLink
111812008 <br /> Salem Court Sanitary Sewer <br /> Cost Estimate <br /> Sankary Sewer(Pressure) Units Qly SlUnit 7otal <br /> Mobilization LS I $2,000.00 $2,000.00 <br /> Connect to existing forcemain LS 1 $2,500.00 $2,500.00 <br /> 1 1/2"HDPE,directionally drilled LF 680 $15.00 $10,200.00 <br /> Sewer service -same side EA S $1,000.00 $5,000.00 <br /> Sewer service-opposite side EA 2 $2,500.00 $5,000.00 <br /> 1 1/4"Curb stop and box EA 7 $900.00 $6,300.00 <br /> Termination flushing connection EA 1 $2,000.00 $2,000.00 <br /> Flushing connection EA 1 $2,000.00 $2,000.00 <br /> Isolation Valve EA 1 $600.00 $600.00 <br /> Street Patch SY 35 $40.00 $1,400.00 <br /> Restoration LS 1 $3,000.00 $3,000.00 <br /> Pressure Sewer-Estimated Construction Cost $40,000.00 <br /> +5%CONTINGENCIES 52,000.00 <br /> +20%LEGAL,ENGINEERING,AND ADMINISTRATION $8,000.00 <br /> +5%CAPITALIZED INTEREST AND BONDING $2>000.00 <br /> TOTAL-PRESSURE SEWER $52,000.00 <br /> C:\Documents and SettingsumoorseU.ocal Setlings\Temporery Internet Files\OLK6\Salem CouA Sanitary COST EST <br />