Laserfiche WebLink
woodwork is within plus or minus 1.0 percent of optimum moisture content from date of installation through <br /> remainder of construction period. <br /> B. Field Measurements: Where woodwork is indicated to be fitted to other construction,check actual <br /> d'unensions of other construction by accurate field measurements before manufacturing woodwork; show <br /> recorded measurements on fmal shop drawings. Coordinate manufacturing schedule with construction <br /> progress to avoid delay of Work. <br /> PART 2-PRODUCTS <br /> 2.1. COMPANIES <br /> 1. Formica Curp. <br /> 2. Laminart. <br /> 3. Micaita Div.,Westinghouse Electric Corp. <br /> 4. Nevamar Corp. <br /> 5. Ralph Wilson Plastics Co. <br /> 6. Sterling Engineered Products,Inc. <br /> ' 7. Other companies that meet the conditions described in this specification <br /> 2.2 MATERIALS <br /> A. General: Provide materials that comply with requirements of the WIC woodworking standard for <br /> each type of woodwork and WIC qua.lity grade indicated,unless otherwise indicated. <br /> 1. Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of each <br /> voluntary standard referenced below: <br /> a. Particleboard: NPA 8. <br /> b. Medium Density Fiberboard: NPA 9. <br /> c. Hardwood Plywood: HPMA FE. <br /> 2.3 FABRICATION,GENERAL <br /> A. Wood Moisture Content: Comply with requirements of referenced quality standard for moisture <br /> content of lumber in relation to relative humidity conditions existing during time of fabrication and in <br /> installation areas. <br /> B. Fabricate woodwork to dimensions,profiles,and details indicated.Ease edges to radius indicated <br /> " for the following: <br /> 1. Comers of cabinets and edges of solid wood(lumber)members less than 1 inch in nominal <br /> thickness: 1/16 inch. <br /> 2. Edges of rails and similaz members more than 1 inch in nominal thiclmess: 1/8 inch. <br /> C. Complete fabrication,including assembly,finishing,and hardware application,before shipment to <br /> project site to maximum extent possible. Disassemble components only as necessary for shipment and <br /> installation. Where necessary for fitting at site,provide ample allowance for scribing,trimming,and fitting. <br /> D. Factory-cut openings,to maximum extent possible,to receive hazdware,appliances,plumbing <br /> fi�ctures,electrical work, and similar items. Locate openings accurately and use templates or roughing-in <br /> diagrams to produce accurately sized and shaped openin�s. Smooth edges of cutouts and,where located in <br /> countertops and similaz exposures,seal edges of cutouts with a water-resistant coating. <br /> Page 3 of 10 <br />