Laserfiche WebLink
G. Nail decking to supports according to ATTC recommendations and details. Provide temporary <br /> waterproof covering to protect exposed decking prior to applying finished roofmg. <br /> H. Repair damaged surfaces and finishes after completing erection and removing wrappings,or <br /> replace damaged members as directed where damage is beyond acceptable repair. <br /> 3.2 PROTECTION <br /> A. General: Control heating,ventilating,and air conditioning in building to avoid damage to or <br /> deterioration of glulam work. <br /> END OF SECTION 06185 <br /> STRUCTURAL GLUED LAD�IINATED TIlVIBER <br /> Page 4 of 4 <br />