My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Lath: Attach to framing or substrate in accordance with ASTM C 1063, lapping sides not <br /> less than 1/2 inch and ends not less than 1 inch. <br /> C. Accessories <br /> 1. Attach level, plumb and true to create a proper screed and depth for the cement <br /> plaster. <br /> 2. Install control joints to create panels relatively square,not larger than 144 square feet, <br /> and with no dimension exceeding 18 feet or a length to width ratio of 2-1/2:1,unless <br /> otherwise shown on the Drawings. <br /> D. Access Panels and Vents:Install accurately located and secured to substrate with appropriate <br /> fasteners as per sections 08310 and 10200. <br /> E. Portland Cement Plaster <br /> 1. Total tluckness to meet code requirements. <br /> 2. Nominal plaster base coat thicknesses <br /> a. First coat"scratch: 3/8 inch. <br /> b. Second "brown": 3/8 inch. <br /> 3. Apply the scratch coat of cement plaster with sufficient force(by hand or machine) <br /> to fill solidly openings in the lath. <br /> 4. Horizontally cross rake the scratch coat slightly to provide key for second base coat. <br /> Coat must be uniform in thickness. <br /> 5. The double-back method of application(first and second coats are applied and cured <br /> as one system)may be used. <br /> a. Apply the second coat(brown)as soon as the scratch coat is rigid. <br /> 6. Apply second coat to provide the required total thiclrness. Coat must be uniform in <br /> thickness.Rod off level to screeds,to provide a hue flat plane. Follow this by wood <br /> floating or darbying the surface. Fill voids and dress surface for finish. <br /> 7. Completed second coat of cement plaster shall cure a minimum 7 days, prior to <br /> application of the finish coat. <br /> F. Stucco Finish Coat <br /> 1. Stucco finish coat shall be applied with su�cient material and pressure to bond to <br /> and cover the brown coa� <br /> 3.3 CLE.�NING <br /> A. Remove spattering of plaster from other finished surfaces,paving and Walks. <br /> B. Remove and legally dispose of plaster system installation debris materiai from project site. <br /> END OF SECTION 04300 <br /> STUCCO <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.