My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Size batches for complete use within one hour after mixing. <br /> 3. Withhold 10 percent mixing water until mixing is nearly complete, then add as <br /> needed to produce necessary consistency. Keep water to a minimum. <br /> B. Mechanical Mixing <br /> 1. Mix each batch separately. <br /> 2. Maintain mixer in clean condition before,during and after plaster preparation. <br /> 3. Maintain mixer in continuous operation while charging mi�cer. <br /> C. Mix Proportions by Volume <br /> 1. Dry Materials—Scratch Coat <br /> a. 1 cubic foot portland cement <br /> b. 1 cubic foot masonry cement. <br /> c. 1.5 to 2.5 pounds of 1/2 inch chopped fiber. <br /> d. 4 cubic feet sand. <br /> 2. Dry Materials—Brown Coat <br /> a. 1 cubic foot portland cement. <br /> b. 1 cubic foot masonry cement. <br /> c. 1.5 to 2.5 pounds of 1/2 inch chopped fiber. <br /> d. 5 to 6 cubic feet sand. <br /> 3. Dry Materials—Stucco Finish Coat <br /> a. 1 cubic foot white portland cement <br /> b. 3/4 cubic foot lime. <br /> c. Pigments as required. <br /> d. 3 cubic feet silica sand <br /> 4. Mixing Liquid: 3 parts water and 1 part acrylic admi�cture. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine the areas and conditions under which the work is to be performed and notify the <br /> General Contractor in writing of conditions detrimental to the proper and timely completion of the <br /> work. <br /> B. Do not proceed with installation until unsatisfactory conditions have been corrected. <br /> 3.2 INSTALLATION <br /> A Building Paper Asphalt Felt <br /> 1. Sha11 be free from holes and breaks other than those created by fasteners. <br /> 2. Apply horizontally with the upper layer lapped over the lower layer not less than 2 <br /> inches.where vertical joints occur,paper sha11 be lapped not less than 6 inches. <br /> *NOTE: NIINNESOTA STATE BUII,DING CODE REQUIRES TWO LAYERS <br /> OF BUII.,DING PAPER ON WOOD BASED SHEATHINGS. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.