2. Size batches for complete use within one hour after mixing. <br /> 3. Withhold 10 percent mixing water until mixing is nearly complete, then add as <br /> needed to produce necessary consistency. Keep water to a minimum. <br /> B. Mechanical Mixing <br /> 1. Mix each batch separately. <br /> 2. Maintain mixer in clean condition before,during and after plaster preparation. <br /> 3. Maintain mixer in continuous operation while charging mi�cer. <br /> C. Mix Proportions by Volume <br /> 1. Dry Materials—Scratch Coat <br /> a. 1 cubic foot portland cement <br /> b. 1 cubic foot masonry cement. <br /> c. 1.5 to 2.5 pounds of 1/2 inch chopped fiber. <br /> d. 4 cubic feet sand. <br /> 2. Dry Materials—Brown Coat <br /> a. 1 cubic foot portland cement. <br /> b. 1 cubic foot masonry cement. <br /> c. 1.5 to 2.5 pounds of 1/2 inch chopped fiber. <br /> d. 5 to 6 cubic feet sand. <br /> 3. Dry Materials—Stucco Finish Coat <br /> a. 1 cubic foot white portland cement <br /> b. 3/4 cubic foot lime. <br /> c. Pigments as required. <br /> d. 3 cubic feet silica sand <br /> 4. Mixing Liquid: 3 parts water and 1 part acrylic admi�cture. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine the areas and conditions under which the work is to be performed and notify the <br /> General Contractor in writing of conditions detrimental to the proper and timely completion of the <br /> work. <br /> B. Do not proceed with installation until unsatisfactory conditions have been corrected. <br /> 3.2 INSTALLATION <br /> A Building Paper Asphalt Felt <br /> 1. Sha11 be free from holes and breaks other than those created by fasteners. <br /> 2. Apply horizontally with the upper layer lapped over the lower layer not less than 2 <br /> inches.where vertical joints occur,paper sha11 be lapped not less than 6 inches. <br /> *NOTE: NIINNESOTA STATE BUII,DING CODE REQUIRES TWO LAYERS <br /> OF BUII.,DING PAPER ON WOOD BASED SHEATHINGS. <br /> Page 5 of 6 <br />