My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Finish: See details for particular edge conditions. Treat all joints screw heads and other <br /> depressions in accordance with USG recommendations for Perf-A-Tape joint system. All <br /> outside corners to have metal bead,taped in. All inside comers to have reinforcing. Ends <br /> of boazd where board terminates or abuts other materials to have metal edge,taped in. Spot <br /> exposed fastener dimples on face layers with at least tliree coats of joint compound, <br /> feathered and sanded smooth. <br /> C. Workmanship <br /> 1. Conform to best practice and as recommended by the manufacturer to produce highest <br /> quality work. Mechanics to be thoroughly trained and skilled in the installation of this type <br /> of work. Accomplish work when temperature in the building is between 50 to 70 degrees F. <br /> Provide ventilation to eliminate excessive moisture. Provide protection to all surfaces, <br /> which are covered before building is enclosed,from damage and the elements. Guarantee of <br /> work under this section shall warrant against ridging and beading of joints and popping of <br /> wallboard fastenings. <br /> F. Delivery and Cleanup <br /> 1. This subcontractor shall be responsible for bringing into this project all materials required by <br /> him to complete his work. <br /> 2. Upon completion of this subcontractors work,he shall remove materials not installed in this <br /> project. <br /> END OF SECTION 09250 <br /> GYPSUM DRYWALL <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.