My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: work without permit
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Road
>
1386 Rest Point Road - 07-117-23-33-0006
>
Correspondence
>
Re: work without permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:27 PM
Creation date
7/24/2018 1:00:27 PM
Metadata
Fields
Template:
x Address Old
House Number
1386
Street Name
Rest Point
Street Type
Road
Address
1386 Rest Point Rd
Document Type
Correspondence
PIN
0711723330006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING PERMIT APPLICATION SUBMISSION REQUIREMENTS(continued) <br /> J. MINNEHAHA CREEK WATERSHED DISTRICT PERMITS <br /> You are required to contact the Minnehaha Creek Watershed District (MCWD) regarding your proposed <br /> project to determine if your project triggers any of the MCWD permitting requirements. The City of Orono <br /> will not issue a building permit without a copy of the permit from the MCWD or written documentation <br /> stating the proposed project does not trigger any MCWD permitting requirements. <br /> K. COSTS OTHER THAN BUILDING PERMIT FEES <br /> 1. Orono Code provides that directly assignable consultants' costs for review of building permit <br /> applications must be paid by the applicant or property owner: <br /> a. City Engineer's costs in excess of$500 <br /> b. City Attorney's costs for review of legal questions and documents <br /> c. Other unusual charges for outside consulting services of appraisers, other engineers and <br /> unusual technical reports after notification to the applicant and property owner that such <br /> services are necessary for review of the application. <br /> In making an application, the applicant and/or property owner agrees to pay these costs as they <br /> occur. Failure to make payment may results in the withholding of the permit inspections or certificate <br /> of occupancy and certification to the property taxes of the unpaid balance. <br /> 2. An escrow of$2,500 is required. Escrows are required for: <br /> a. New Home Construction <br /> b. Additions <br /> c. New Buildings(Garages, Accessory Structures) <br /> d. Grading Projects <br /> 3. An escrow for wetland buffer improvements may be required. The amount will be determined by the <br /> scope of the project. <br /> 4. Once a building application is received, the appropriate escrow agreement will be prepared by staff <br /> and sent to the property owner for their signature(s). <br /> K. PERMIT APPLICATION; INFORMATION REQUIRED <br /> 1. The application for a construction permit shall include such information as may be required by the <br /> city, which may vary between types of construction projects. <br /> 2. Surveys required: <br /> a. Initial survey. The certificate of survey shall conform to the standards on file in the office of <br /> the building official. <br /> b. Foundation survey. The foundation survey will certify lot dimensions; front, side, rear, <br /> lakeshore, and wetland setbacks; and foundation elevation. A foundation survey must be <br /> submitted before proceeding with framing or further construction. In lieu of a survey a letter <br /> prepared by a Minnesota Registered Land Surveyor containing the same information as a <br /> foundation survey may be submitted. <br /> c. As-built survey. The as-built survey shall certify the final topography of the site; verify <br /> drainage pattems; and provide hardcover calculations for lots in the Shoreland Overlay <br /> District. An as-built survey must be approved before the issuance of a certificate of <br /> occupancy. In the event that weather or other conditions prevent the completion of an <br /> as-built survey at the time the Certificate of Occupancy is requested, a temporary <br /> Certificate of Occupancy may be issued upon receipt of a $10,000 financial guarantee <br /> and establish an escrow agreement to ensure completion of the as-built survey and all <br /> site improvements. <br /> Packet Last Updated: 04l19/2013 <br /> Page 5 of 23 <br /> � , ' � , <br />
The URL can be used to link to this page
Your browser does not support the video tag.