Laserfiche WebLink
: 81�� i c� — 71 m wr a,� t�ll o( I�.j �� j �fzcff. � a-�-�d � . <br /> � i (�C� a:�?J' �-I-� 6.S V`P�i �� -w/ r,l-;cd����J�� <br /> 4� (ov�'fi� a�-e . u7� <br /> _ �v�-�`jUtir�►-�a�u�-� * v►�c�r``-P��r�-�t71.cS k _ � <br /> Melanie Curtis <br /> From: Tim Lovett[csilandscaping@yahoo.com] � ����-I ��a �� <br /> Sent: Wednesday, August 11, 2010 11:44 AM �GP/'UY �� <br /> To: Melanie Curtis <br /> Subject: Re: 1348 Rest Point Cir- Permits 2010-00613 & 00614 <br /> Hi Melanie <br /> I guess I am a little confused about these changes you want us to make at 1348 Rest Point Cir. for a couple of <br /> reasons. First, I met with the city planner and the city engineer on site with the homeowner before the project, <br /> and we all agreed that installing BodPave in these 2 areas was fine due to the fact that it is a 100%permiable <br /> product when installed correctly. Second, I did install the product correctly without draintile - as adding <br /> draintile is only recommended when the water needs to be channeled out from under the product to another <br /> area. I consulted directly with BodPave about this when we purchased the material. Without the draintile, the <br /> water permiates directly under the BodPave product as fi it wasn't even there. In fact the city engineer on site <br /> agreed that we would probably be increasing permiability in these areas when we tore out the hard compacted <br /> clay top layer that was left behind by the builder. Finally, it was understood that the homeowner will often need <br /> to park up along the road. This was creating a muddy mess since he needs to park all the way in the grass in <br /> order for vehicles to pass, due to all of the mail boxes directly across the street. With no city curbing on Rest <br /> Point Cir the run-off from the street was creating erosion that would eventually plug the new dry river bed and <br /> drain-tile system with mud over time. This would in-turn seriously jeprodise the proper water drainage for 1348 <br /> and the neighbor to the north, that we and you have worked so hard to correct. Please call me anytime to further <br /> discuss these issues. I am happy to come in to the city offices or meet with you on site if necessary. I will also <br /> contact my BodPave representitive and get a letter from him backing up our installation techniques and the <br /> products permiability. <br /> Thanks, <br /> Tim Lovett <br /> 612-226-8344 <br /> --- On Tue, 8/10/10, Melanie Curtis <MCurtis(a�,ci.orono.mn.us>wrote: <br /> From: Melanie Curtis <MCurtis e,ci.orono.mn.us> <br /> Subject: 1348 Rest Point Cir- Permits 2010-00613 & 00614 <br /> To: "'csilandscaping@yahoo.com"' <csilandscaping,�a�yahoo.com> <br /> Date: Tuesday, August 10, 2010, 1:44 PM <br /> Tim <br /> Thank you for submitting your construction details for the BodPave installed at 1348 Rest Point Cir. <br /> � We have reviewed your cross-section, the BodPave installation specifications as well as the marked-up <br /> site plan. According to our engineer, after reviewing your cross-section, the BodPave was not installed <br /> according to manufacture specifications for a fully permeable area. Based on your plan, it appears that <br /> the necessary drain tile was not installed. Further, an area along Rest Point Circle was improved with <br /> BodPave. This area was not discussed with City Staff and is not approved. <br /> The BodPave area between the driveways must be modified to meet the permeability installation standards or it <br /> 1 <br />