My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: H.S. exhaust hood
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Correspondence
>
Re: H.S. exhaust hood
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:05 PM
Creation date
2/27/2018 1:23:24 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Correspondence
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� w <br /> Hennepin County Human Services Department <br /> • Public Health Protection Epidemiology:(612)-543-5230 <br /> Epidemiology and Environmental Health Environmental Health:(612)-543-5200 <br /> 1011 South First Street,Suite 215 FAX:(952)-351-5222 <br /> Hopkins,MN 55343-9413 www.co.hennepin.mn.us <br /> July 13, 2010 <br /> Chad Rettke, Senior Project Manager RECEIVED <br /> Kraus-Anderson Construction Company JUL 15 2010 <br /> 8625 Rendova Street N.E. CITYOF <br /> P.O. Box 158 ORONO <br /> Circle Pines, MN 55014 <br /> XXX APPROVED <br /> Re: Orono High School Exhaust Hood <br /> Dear Mr. Rettke: <br /> The submitted plans and specifications appear to be in general conformity with the <br /> standards of Hennepin County Ordinance Number 3 and Minnesota Rules, Chapter <br /> 4626. These plans are now approved. Although this plan has been approved, the <br /> following items listed below need to be addressed prior to completion of the project: <br /> Equipment <br /> 1. Ensure that there are stainless steel trim pieces added as the four hoods are <br /> placed together to close any gaps between hood sections. Additional sealing with <br /> caulk may be needed if these are not tight fitting to prevent the collection of <br /> debris. <br /> 2. All equipment producing heat, steam, grease and/or vapors must be located <br /> sufficiently underneath the hood to provide a minimum of a six inch overhang <br /> extending beyond the front edge of the equipment to the interior edge of the <br /> hood. <br /> Room Finishes <br /> 3. The half wall between cooking lines under the hood must have material finishes <br /> that are smooth, cleanable, durable, such as ceramic tile, stainless steel, etc. <br /> Any grout lines must have a penetrating seal. The base of the half wall should <br /> have a curved mopping radius at the floor. What materials are proposed? <br /> 4. Ceiling tiles must be smooth, cleanable, nonabsorbent, and light-colored. <br /> Fissured, perforated or rough acoustical tile is not permitted. Ensure that any <br /> modifications to the current ceiling tiles meet these criteria. <br /> An Equal Opportunity Employer Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.