My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: occupancy requirements
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2180 North Shore Drive - 10-117-23-31-0098
>
Correspondence
>
Re: occupancy requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:24:58 PM
Creation date
10/3/2017 1:54:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
North Shore
Street Type
Drive
Address
2180 North Shore Drive
Document Type
Correspondence
PIN
1011723310098
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . .�--� <br /> �O� <br /> O�`,, O <br /> =�Y�:���=-� `�' CITYof ORONO <br /> , -:�r -�� � <br /> a A��� �.���. �i M��, ot��� <br /> � f�,,����,� �/ � <br /> �� '�"-����<; ���'�G Street Address: Mailing Addross: <br /> �, , , ;;. <br /> '�$�HQ4' 2150 Kelley Parkway P.O. Boz 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> August 7, 1995 <br /> Ms. Annette LeSueur <br /> Atelier LeSueur <br /> 2180 North Shore Drive <br /> Wayzata, Minnesota 55391 <br /> Re: Occupancy Requirements - 2180 Iv'orth Shore Drive <br /> Dear Ms. LeSueur: <br /> I have completed a preliminary review of your submittals for change of occupancy at 2180 North <br /> Shore Drive in Orono. I apologize for the tardiness of this review. The City is experiencing <br /> a lot of construction activity. <br /> Attached are my plan review notes. These should be considered when preparing plans for a <br /> building permit application. The building permit is required to build the ramp, remodel the <br /> restroom, repair the second floor exit and comply with the building code items related to the <br /> occupancy classification change. <br /> The required work should be completed as soon as possible but before school starts in the fall. <br /> If you have any questions, feel free to contact me at my office. <br /> Sincerely, <br /> � l'�'�M'e`""'" <br /> L e Oman <br /> Building Official <br /> LO/ch � <br /> Enc. <br /> cc: Jeanne A. Mabusth, Building & Zoning Administrator <br /> Bruce L. Vang, Field Inspector � <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.