Laserfiche WebLink
zs 1���� <br /> a�G ��,�� <br /> .�, <br /> MEMORANDUM �"Fu LL � <br /> � <br /> � <br /> a <br /> # <br /> To: Annefte LeSueur � <br /> �to1v1: Jennifer Yoos � <br /> PR07ECT: Atelier LeSueur -- --- --- <br /> SUB7ECT: Conversation with Lyle Oman, Orono Building Inspector Cuningham <br /> Hamilton <br /> DA�: Monday, August 28, 1995 puiter, P.A. <br /> cc: Russell Saulon (Atelier LeSueur), Lyle Oman (City of Orono) Architects <br /> 201 Main St.S.E. <br /> Annette, I have contacted Lyle Oman in response to your concerns Suite 325 <br /> regardina the letter you received from the city of Orono. Minneapo�is,MN <br /> 55414 <br /> As a clarification, he did intend that all construction work would be <br /> Telephone: . <br /> completed by the start of school in the fall. After further discussion, he is willing 612-s�9-saoo <br /> to extend this requirement and take into consideration the cunent financial Facsimi�e: <br /> situation of the school. He requests that we meet to set up a time frame for code 612-379-4400 <br /> modifications and set a priority for construction items that involve life safety <br /> John W.Cuningham,FAIA <br /> issues. These items would include exiting at all levels of the building, reattaching John E.Hamilton,AIA <br /> the fire escape and providing a handicapped ramp to the first level. �ohn E.cluiter,AIA <br /> Thomas L Hoskens,AIA <br /> Since you currently have an enrollment that is lower than anticipated you <br /> might be able to modify your use of the building. A temporary option might be <br /> to limit use in specific areas (e.g., basement or second floor) and make <br /> corrections sooner in areas that you intend to use fully (first floor). <br /> Please contact me at your earliest convenience to set up a meeting to <br /> discuss these issues and options that might be available to resolve them. <br /> P:�PROMOWTELIER.DOC <br />