My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RE: sewer project
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1150 Heritage Lane - 10-117-23-13-0004
>
Correspondence
>
RE: sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:04 PM
Creation date
1/26/2017 11:53:05 AM
Metadata
Fields
Template:
x Address Old
House Number
1150
Street Name
Heritage
Street Type
Lane
Address
1150 Heritage Lane
Document Type
Correspondence
PIN
1011723130004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _�� <br /> ,',i O \ <br /> � � � <br /> ���� ��'���., <br /> s. �,t�,,.- ,� ��� CITY of ORONO <br /> �� r;� , .,� ��l�, - Municipal Offices <br /> ov 1 � <br /> � ����`�` �%� Street Address: Mailing Address: <br /> `,;.�� � ,`��g,�, ;, <br /> �,_,$�H�� 2750 Kelley Parkway P.O. Box 66 <br /> ---- Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> February 18, 2000 <br /> Anthony& Evangeline Nicklo�v <br /> 1150 Heritage Lane <br /> Wa��zata, Mn 5�391 <br /> Dear Mr. & Mrs. Nicklo�v: <br /> The above described property is in a Metropolitan Urban Service Area(MUSA) for sanitary sewer <br /> installation. The factors for initi�ting the sewer project were smaller lot sizes and non-compliant septic <br /> systems with limited replacement sites available. The residence was required to connect to the sewer <br /> svstem no later than February 14, 2000. Recently�, the City Council adopted a resolution allowing all <br /> sewer connections to coincide�vith the septic system upgrade time frame. The time frame for a septic <br /> system upgrade is seven to ten years from the inspection date dependant upon the property's location. <br /> Your property�vill need to connect to the sanitary sewer system no later than December 31, 2007, which <br /> is the date your septic system�vas to bc upgraded. A Sewer Availability Charge (SAC) fec will need to <br /> be paid to tlle City in the ycar the se��er connection is made. A licensed plumber must then obtain a <br /> pennit from tlie City to make the connection from the residence to the actual se�ver line. <br /> tf at any time before December 31, 2008 the residence undergo's a remodeling project that will increase <br /> t11c total w�ater use, the residence must then connect to the sanitary se���er system. If at any time before <br /> the zbove date the system is failing, the residence must then immediately connect to the sanitary se�ver <br /> systcm. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic tanlcs, <br /> repairing or replacing pumps, and replacement of septic tank baffles are examples of acceptable repairs. <br /> If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, <br /> connection to thc sauitary se�ver system will be required. <br /> If there are any questions regarding this letter, please contact me at (612) 2�9-4600. <br /> Re p ctfully, <br /> • ���� <br /> Chris Pence <br /> On-Site S��stems Manager <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.