My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Temp COO and COO
Orono
>
Property Files
>
Street Address
>
E
>
Eileen Street
>
3625 Eileen Street - 05-117-23-21-0024
>
Land Use
>
Temp COO and COO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:19:41 PM
Creation date
7/18/2016 3:02:41 PM
Metadata
Fields
Template:
x Address Old
House Number
3625
Street Name
Eileen
Street Type
Street
Address
3625 Eileen St
Document Type
Land Use
PIN
0511723210024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> CERTIFICATE OF OCCUPANCY <br /> � TEMPORARY CERTIFICATE� <br /> Building Address: 3625 EILEEN ST <br /> PIN: OS-117-23-21-0024 <br /> Legal Description: Riedel Co Stubbs Bay Addn <br /> Block MB Lot MB <br /> Zoning District: <br /> Permit No: 2013-00238 <br /> Work Activity: Single Family <br /> Construction Type: VN <br /> Occupancy• <br /> Occupant Load: <br /> Fire Sprinkler: N <br /> Applicant: Betz Builders Inc. <br /> Applicant Address: 300 Crestview Ave. <br /> City, State, Zip: Long Lake, MN 55356 <br /> Owner Name: Bob Ryan <br /> Owner Address: 3625 Eileen St <br /> Cit3, State, Zip: Maple Plain, MN 55359- <br /> THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING. THESE MUST BE <br /> CORRECTED OR COMPLETED AND REINSPECTED WITHIN THE SPECIFIED <br /> NUMBER OF DAYS OR THIS CERTIFICATE WILL BE VOID <br /> Failure to correct these de�ciences will cause occupancy violation citations to be issued <br /> To be completed b}�June 16.2014 <br /> * As-built survey to be submitted and approved showing: <br /> All exterior improvements completed(driveway, etc) and shown on as-built survev <br /> Final�radinb completed and shown on as-built survey <br /> * Erosion control to remain in place until sod/vegetation is established <br /> 1 her agree to make the above corrections and to call.for reinspection witlr the time allowed: <br /> � /�, ��, ���/� <br /> Owner/Contractor Date <br /> , � <br /> / jn �SV1 VC:----' f �t''`f ' f <br /> Buil'in��Official K Zonin�Administrator c� Cin� E,n��ineer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.