My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Temp COO and COO
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
790 Brown Road North - 34-118-23-11-0003
>
Land Use
>
Temp COO and COO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:32 PM
Creation date
6/27/2016 3:11:57 PM
Metadata
Fields
Template:
x Address Old
House Number
790
Street Name
Brown
Street Type
Road
Street Direction
North
Address
790 Brown Road North
Document Type
Land Use
PIN
3411823110003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> CERTIFICATE OF OCCUPANCY <br /> � TEMPORARY CERTIFICATE � <br /> Building Address: 790 BROWN RD N <br /> PIN: 34-118-23-11-0003 <br /> Legal Description: Reg. Land Survey No. 1275 <br /> Block 000 Lot 000 <br /> Zoning District: <br /> Permit No: 2015-00077 <br /> Work Activity: Single Family <br /> Construction Type: N <br /> Occupancy: Residential <br /> Occupant Load: <br /> Fire Sprinkler: N <br /> Applicant: Gonyea Homes <br /> Applicant Address: 6102 Olson Memorial HIghway <br /> City,State,Zip: Golden Valley, MN 55427- <br /> Owner Name: Gonyea Homes <br /> Owner Address: 6102 Olson Memorial Hwy <br /> City, State,Zip: Golden Valley, MN 55427- <br /> THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING. THESE MUST BE <br /> CORRECTED OR COMPLETED AND REINSPECTED WITHIN THE SPECIFIED <br /> NUMBER OF DAYS OR THIS CERTIFICATE WILL BE VOID <br /> Failure to correct these deficiences will cause occupancy violation citations to be issued <br /> To be completed by October 1,2015 <br /> • As-built survey to be submitted and approved showing: <br /> -All exterior improvements completed(driveway,etc.)and shown on as-built survey <br /> -Final grading completed and shown on as-built survey <br /> -Location of wetland buffer monuments <br /> • Erosion control to remain in place until sod/vegetation is established <br /> I he�eby a ree to make the above corrections and to call for reinspection with the time allowed: <br /> (',h+��, w�.atk�:o�v�- �•L��Lo�5 <br /> Owner/Contractor Date <br /> � � ����//�-' <br /> i m �cia Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.