Laserfiche WebLink
CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />Permit <br />Fee $ <br />Entered By <br />The General Contractor will be given a copy of this report and is <br />responsible for its dis-cribution to all sub -contractors. SEPTIC SYSTEM <br />DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. <br />LOCATION: <br />GENERAL CONTRACTOR: <br />SEPTIC CONTRACTOR: <br />OWNER: <br />❑ APPROVED <br />CONDITIONALLY APPROVED: <br />COMMENTS: <br />V)(V <br />(Note Changes Below) <br />C �r <br />PHONE: <br />PHONE: <br />PHONE: <br />NOTICE T" INSTALLERS: Anv chances to the aporoved plans and specs Rust have prior <br />approval of the Inspector (473-7357). Call for inspections 24 hours in advance. <br />TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br />and after system installation to avoid compaction of the natural soi <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF Drier to building site excavation and fencing must <br />remain in place until final site grading. Approval to pour footings will not be granted <br />until the Inspections Department has verified that primary and alternate sites are <br />adequately protected. <br />NO VEHICULAR TRAFFIC OF AB7 KIND (cars, trucks, earth moving equipment, etc.) is <br />within 20' of tested drainfield sites either before or after system construction. Ti:is <br />applies to the lot you are working on and all adjacent lots. You could be held liable for <br />damaging sites on neighboring lots. <br />VEHICULAR TRAFFIC CAR CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UXUSABLE. <br />Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br />Damaged alternate sites must be replaced before a Certificate of occupancy will be issued. <br />Date Appro ed By(,City of Orono <br />