Laserfiche WebLink
SEPTIC SYSTEM INFORMATION <br />STREET ADDRESS <br />LOT 5 BLOCK <br />is ey si e <br />2 <br />SUBDIVISION Tandem Pronert-iPs <br />MONTH AND YEAR TESTING DONE 12-19-93 <br />ITEMS ALREADY COMPLETED Borings, perc_ tests, system design, and <br />site plan <br />NEED TO COMPLETE BEFORE ISSUING BUILDING PERMIT: <br />❑ BORINGS <br />❑ PERC TESTS <br />❑ SYSTEM DESIGN <br />® SITE PLAN A new site plan may be required if the house <br />location or elevations are significantly different. <br />❑ OTHER <br />❑ CON24ENTS <br />DATE THIS SHEET FILED Januar 13, 1994 BY <br />SUBDIVISION FILE NO. 1901 <br />