My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6-3-24 Septic Compliance report
Orono
>
Property Files
>
Street Address
>
F
>
French Creek Drive
>
1285 French Creek Drive - 10-117-23-32-0007
>
Septic
>
6-3-24 Septic Compliance report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 4:25:11 PM
Creation date
6/5/2024 4:24:40 PM
Metadata
Fields
Template:
x Address Old
House Number
1285
Street Name
French Creek
Street Type
Drive
Document Type
Septic
PIN
1285
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SP TESTING INC <br />Steven B. Schirmers - 951 Katydid Lane NE -St. Michael, MN 55376 <br />Cert. No 627 - State License #394 - Phone 763-497-3566 - Fax 763.497-5011 <br />www.sptesting.wastewater(-@comcast.net- schirmerswastewater.com <br />June 3, 2024 <br />Brian O'Connell -- Lynne Rasmussen <br />1285 French Creek Dr. <br />Orono, MN <br />A Compliance inspection was completed for the existing on-site sewage treatment <br />system located on this property for the sale of the home. The system consists of a <br />Type IV, Performance system with 1 - 1000 gallon trash trap tank, 1-1000 gallon <br />pump tank (pump #1) pumping 15.6 gallons every 30 minutes to a 1000 gallon Multi - <br />Flo Unit then flowing to another 1000 gallon pump tank (pump #2) that pumps to a <br />1200sq.ft. trench system. The Multi -Flo was added to the existing system in 2003 to <br />rehab the existing trenches that were hydraulically overloaded. Soil probing in to <br />the trench system found no ponding or hydraulic overloading on 5-23-24. <br />Soil borings into the system found the bottom of the rock at 42" below existing <br />grade. 10" to 12" of fill soil was found between the trenches. This leaves the bottom <br />of the trenches at 30" to 32" below the original soil. Soil boring #1 found mottled soil <br />(redox features) at 70" below grade & the bottom of the trench at 32" below grade <br />leaving a 38" separation. Soil boring #2 found mottled soil at fib" below original <br />grade & the bottom of the trench at 32" below grade leaving a 36" separation from <br />the bottom of the rock & redox features. This system meets the required separation <br />as designed & is classified as in compliance with Minnesota Chapter 7080 rules. <br />Annual monitoring of the seepage bed has found no hydraulic overloading or ponding. <br />The Multi -Flo has been serviced by Schirmers Wastewater Treatment Systems since <br />it was installed. Monitoring of the trenches have found the trenches dry. No <br />indication of hydraulic overloading. The Multi -Flo Unit requires to be serviced 2 <br />times a year at a cost of $275.00 a year (2024 price). The trenches have to be <br />monitored 1 time a year at a cost of $50.00 a year (2024 price). These prices are <br />subject to change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.