My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ltrs re various aspects of work at the property
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Lane
>
3260 Bohns Point Lane - PID: 08-117-23-44-0008
>
Correspondence
>
Ltrs re various aspects of work at the property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:44 PM
Creation date
10/16/2015 2:25:43 PM
Metadata
Fields
Template:
x Address Old
Address
3260 Bohns Point Ln
Document Type
Correspondence
PIN
0811723440008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. -_-._.._�.-\ <br /> O ��, <br /> , �' �' <br /> % O\ <br /> �- O <br /> ' C ITY of ORONO <br /> ,� , f � . ,,, <br /> � „� � � ry �� � .�: �, �� Municipal Offices <br /> ���� �� ' `�`�`�' ������ Street Address: Mailing Address: <br /> ,; l �� �i,,, <br /> \,'��'�HQ�� 2750 Kelley Parkway P.O. Box 66 <br /> =___--� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> November 4, 1999 <br /> Bob Ritter <br /> 4130 Terrace View Lane <br /> Plymouth, Minnesota 55447 <br /> Re: Meeting on Site with Neighbors of 3260 Bohns Point Lane <br /> Dear Bob: <br /> On November 3, 1999 Ron Moorse, City Administrator, and myself inet with the neighbors of your <br /> building site at 3260 Bohns Point Lane. We again stated that the City has no enforcement power <br /> over private easements. There are issues, however, that need your attention. <br /> 1. When your excavator comes back to move the driveway(as we discussed), the City <br /> will require you to remove any fill from the 5' setback and rough in the swale to <br /> accommodate rains and spring thaw. I would like to meet you and the excavator on <br /> site to discuss this before the work is started. <br /> 2. The berm you created next to the outlot must meet a 5' setback from the property line <br /> and the silt fence must be fixed up in that area. <br /> 3. Prior to final grading,the City will require you to submit a grading plan done by your <br /> surveyor. The plan will show how the cul-de-sac drainage will be directed by <br /> existing and proposed contours. <br /> If you have any questions, please feel free to contact me at my office. <br /> Sincerely, <br /> ��l�^'�--� <br /> L� le Oman <br /> Y <br /> Building Official <br /> cc: Ron Moorse, City Administrator <br /> Marc Davis, Building Inspector <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.