My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2018 septic design
Orono
>
Property Files
>
Street Address
>
L
>
Lillian Lane
>
2845 Lillian Lane - 33-118-23-34-0018 - New Address
>
Septic
>
07-16-2018 septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:51:00 PM
Creation date
8/16/2022 2:13:40 PM
Metadata
Fields
Template:
x Address Old
House Number
2845
Street Name
Lillian
Street Type
Lane
Address
2845 Lillian Lane
Document Type
Septic
PIN
3311823340018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 bedroom <br />2250 Septic Tank <br />1250 Pump Tank Joseph Olson D.B.A. <br />City of Orono Septic Plan Review <br />Reviewer; 1� <br />All work shall be done in full compliance <br />with all applicable septic and zoning code. <br />Rusty Olson's--Soil and Percolation Testing <br />10 X $3 Rock Bed. Joseph J. Olson--MPCA License # 810 <br />11481 Riverview Rd. NE, Hanover, MN 55341 <br />3$ GPM Pump (763) 498-8779 Fax (763) 498-8290 <br />with 35# TDS <br />Revised July 16, 2018 <br />Chamberlin Capital . <br />2845 Lillian Lane I1 CY, <br />Orono, Hennepin County at <br />This on-site Sewage Treatment System is designed for a Type I five -bedroom home in accordance with the <br />Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br />The periodically saturated soils were located at 14-18 inches (mottled soil). Due to the periodically <br />saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br />effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system <br />is designed with 6 inches or rock. <br />The future site is dual rock beds using gate valves for unlevel pressure distribution. <br />All neighboring wells are greater than 100' from proposed treatment areas. <br />The soils at a depth of 12" have a percolation rate averaging 4 MPI. <br />A 2250 -gallon combination septic tank or it equivalent needs to be installed. <br />All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks. Clean <br />outs must be installed on the end of the laterals for maintenance. <br />A 1250 -gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br />power supply and switches must be located outside the manhole and pumping chamber in a weatherproof <br />enclosure. A warning device must be installed with light and sound devices; this is in case of a pump <br />failure. A flow measurement device must be installed. Including but not limited to a water meter, event <br />counter, running time clocks or electronically controlled dosing. <br />With proper installation and maintenance, this system should have no problem in treating septic effluent <br />effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be <br />disposed of into the septic tanks. Garbage disposals are not recommended. Iron filters cannot go into the <br />system. Additives must not be used they may cause harmful damage to your septic system. It is <br />recommended that you pump the septic tanks every two years. <br />Sincerely, <br />` Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.