Laserfiche WebLink
紘 定鋤 ′ <br />働脅710雅兄/徽eq 〃W影謂 <br />偽佃ヶ所右紡6 ん佃り訪姉梯 <br />」uiy 17, 2019 <br />Dingman Custom Homes <br />4340 Lakeview Cou「t <br />Orono, MN <br />SEPTIC DESIGN <br />Notes: <br />」ob Site: 4340しakeview Cou巾Orono, MN <br />The septic system was designed for a TγPe-1′ 5 bedroom home at 750gal per day. Two <br />SePtictanks wilI be installed, 1-1250gal tank and l-1000 gal tank. There wi= aIso be a l-1000 <br />gaI pump tank. A= tanks wi= be insta=ed north ofthe new home. The septic sγStem Wiii be a <br />mound system with a lO' x 63- rock bed′ With 6" ofwashed rock underthe pipes. A l請pump <br />WiiI need to be instaIled in the home to iift the septicfrom the basement ievei. <br />Soii borings were taken and mottling was seen at 18一’belowgrade. The materials are a <br />Clay ioam with an absorption rate of.45 gpd/ft. <br />Th「ee l l12一“ laterals 61’Iong w冊be insta=ed with 7/32’一perforations 3- apart. <br />Ali neighbors welIs are over lOO’awaγ. <br />There are severai trees on the propertyon the septic area that wi∥ have to be <br />removed. <br />1t is highIy recommended that all tanks are pumped after alI construction is complete. <br />Nothing other than gray water, (laundry, Showers, etC.) human water and toilet tissue should <br />be disposed into the septic tank. AII tra怖c must remain off the site to prevent compaction to <br />the soil・ The tank should be pumped every 2 to 3 years forthe iongevity ofthe system. <br />#8187