Laserfiche WebLink
a <br /> � ���' �� � <br /> September 2, 1986 <br /> Dear Crystal Bay Resident: <br /> The sanitary sewer project in the Crystal Bay area was <br /> completed, inspected and accepted on June 11, 1986. There are <br /> some ,restoration items yet to be completed. <br /> If you have not already done so, you can connnect your <br /> � <br /> residence or business to the sanitary sewer main line. � <br /> The deadline for connection to the sewer main line is 16 <br /> months from June 11, 1986 or October 11, 1987. <br /> A licensed contractor is required to make this type of <br /> connection in the City of Orono. <br /> The contractor must obtain a permit from the City prior to � <br /> any work being done. <br /> The permit fee is $30.50. A Service Availability Charge <br /> (SAC) of $475.00 must be paid before or at the time the permit is <br /> issued. Be advised that the City of Orono is only the collection ; <br /> agency for the SAC fee. The Metropolitan Waste Control 's <br /> Comnnission actually receives these monies. � <br /> i <br /> - Some of you may have alr�ady paid the SAC fee in advance. � <br /> For your information, your existing septic tank must be <br /> pumped and filled with approved fil 1 when connection to the sewer � <br /> main has been completed. <br /> If you have any questions, please feel free to call me at <br /> 473-7359. � <br /> Sincerely. , <br /> ���� <br /> 9 <br /> John R. Gerhardson, <br /> Publac Works Coordinator • <br /> JRG/tln <br />