My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic system design
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2205 Abingdon Way - 03-117-23-24-0005
>
Septic
>
Septic system design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:49 PM
Creation date
7/27/2015 12:18:22 PM
Metadata
Fields
Template:
x Address Old
House Number
2205
Street Name
Abingdon
Street Type
Way
Address
2205 Abingdon Way
Document Type
Septic
PIN
0311723240005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ... � .7-P TESTl1VG� ��C. Steven B. Schirmers & Debra M. Schirmers <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> � <br /> � <br /> September 27, 1998 <br /> Christine Bruce <br /> 2205 Abingdon Way <br /> Orono, Henn. Co., MN <br /> A future expansion site wa� evaluated for this property. The design will need to be <br /> completed prior to insta�lation. <br /> The soils on this site are SCS soils mapped - Lr6 - Lester loam. The seasonally <br /> saturated soils were located at 24" to 36" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 3.0 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod tayer below the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. ' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.