My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-2017 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2017
>
08-21-2017 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 8:27:52 AM
Creation date
1/19/2018 8:27:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,August 21,2017 <br /> 6:30 o'clock p.m. <br /> ROLL CALL <br /> The Orono Planning Commission met on the above-mentioned date with the following members present: <br /> Chair John Thiesse, Commissioners Kevin Landgraver, Bruce Lemke, Denise Leskinen, Chad Olson, <br /> Loren Schoenzeit, and Jon Schwingler. Representing Staff were Community Development Director <br /> Jeremy Barnhart, City Planner Melanie Curtis, City Planner Laura Oakden, and Recorder Jackie Young. <br /> Chair Thiesse called the meeting to order at 6:30 p.m., followed by the Pledge of Allegiance. <br /> NEW BUSINESS <br /> 1. APPROVAL OF PLANNING COMMISSION MEETING MINUTES OF JULY 17,2017 <br /> Landgraver moved,Leskinen seconded,to approve the minutes of the July 17,2017,Planning <br /> Commission meeting as submitted. VOTE: Ayes 7,Nays 0. <br /> 2. 17-3949 DALE GUSTAFSON ON BEHALF OF KEVIN KRETSCH,3155 CASCO <br /> CIRCLE,VARIANCE,6:32 P.M.—6:44 P.M. <br /> Dale Gustafson,Applicant,was present. <br /> Oakden stated the applicant is requesting a setback variance for construction of new retaining walls <br /> within 75 feet of the OHWL in the lake yard. The applicants are adding retaining walls and landscaping <br /> along the shoreline. The property abuts Lake Minnetonka and has a slope into the shoreline. There are <br /> currently stairs leading down the slope creating an access to the lake. The applicant is proposing to <br /> replace the stairs in kind and to strengthen the slope along the lake by installing additional retaining walls. <br /> The applicant is working with the Minnehaha Creek Watershed District to add rip-rap along the water line <br /> and they are also proposing to add boulders above the rip-rap along the base of the slope creating what <br /> appears to be a retaining wall to protect the rip-rap and slope. <br /> The proposed walls range between one and four feet high and run from property line to property line <br /> creating the need for a building permit. The walls are also situated at the ordinary high water line of the <br /> lake. The applicant is hoping to proactively prevent further erosion of the slope. <br /> The City Engineer has reviewed the proposal and is requesting a building permit be obtained in addition <br /> to engineering of the walls. <br /> Included in Staffs report is an analysis of the practical difficulties for the variance. <br /> The applicant has submitted some photographs of the existing stairs they would like to replace in kind. In <br /> addition, Staff has conducted a site visit and took photographs as well to illustrate the current condition of <br /> the slope. Oakden displayed a photograph of the existing stairs looking to the east. With regard to the <br /> walls protecting the stairs, Staff finds practical difficulties exist with the existing conditions and find a <br /> need to stabilize and protect the slope from erosion. <br /> Staff has concerns regarding the linear retaining wall that runs along the shoreline that is connected to the <br /> rip-rap. A thorough grading review by the City Engineer will occur upon submittal of the building permit <br /> Page 1 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.