Laserfiche WebLink
, - ��o.__ �:.:, <br /> ;;�� � �' ��, <br /> �� �,_ . � ` <br /> I( ,,. ,;, . ,� CITY of OltONO <br /> �., .a �- r ��. <br /> �, ' i,r MunicipalOffices <br /> � � � <br /> ,� � , G�',; <br /> Street Address: Mailing Address: <br /> � �9JfE$xp4�'� 2750 Keliey Parkway P.O, Box 66 <br /> � �_ __-,._.-_-- Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address ;� � S /l�c�� �G'` /���"/►'� Z-!� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes � <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identif as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31,2010 �� <br /> Other ' <br /> Septic Tan��ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> /�JD f2 c�;- � � . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> � <br /> Inspector: �� � Date of Inspection �- bS <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> ww�w.ci.orono.mn.us <br />