Laserfiche WebLink
= -�-; <br /> ;� � � \`'�� <br /> ,';` O O\;� <br /> �' CITY of 4RONa► <br /> ;� . ,i <br /> � , <br /> �, ,,,� ''��` _ ��� <br /> �,t <br /> ; ,� '��; � 'i ' ,. �,,/ Municipal Offices <br /> �,, � . . _ G~ ;; <br /> " ,, � Street Address: Mailing Address: <br /> \ �`4kEgHp�'�: 2750 Kelley Parkway P.O. Boz 66 <br /> _ Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address `'� ?�p ,N O r�^ �l�^�+ �r u..> <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes � <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes <br /> No �� <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> ;�_ � �o S . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> '�< � J <br /> i � � �� <br /> Inspectdr������� �����',� Date of Inspection � �� <br /> Telephone(9�2)249-4600 � Fax (9�2) 249-4616 <br /> www.ci.orono.mn.us <br />