Laserfiche WebLink
Melanie Curtis <br /> From: dsi750@juno.com <br /> Sent: Friday, November 05, 2010 3:04 PM <br /> To: Melanie Curtis <br /> Subject: Code violation letter <br /> Melanie: re: your letter of 2 Nov 2010 <br /> I have already started compliance with your order, and have hired a man to cut downed trees and scrap wood into <br /> firewood. <br /> The general sequence is to remove prohibited items from outside storage, starting with the piles of dimension lumber and <br /> building materials. <br /> There might have been a misunderstanding regarding the aluminum shed on the property, which has stood in its present <br /> structural form without weather damage since the early 1970s, but is undergoing maintenance to strengthen the <br /> connections between the panels, and has had a central roof support temporarily removed to facilitate the work. This <br /> support pillar will be replaced before the snow flies, and when this is done, I will be able to demonstrate that snow load <br /> and wind load requirements are met. <br /> In addition, the originally open sides are being closed in, bringing the structure further into compliance. <br /> I will work with Lyle Oman on the shed issue. <br /> Given the scope of your order, the amount of outdoor physical work necessary, and the risk and difficulty presented by <br /> the imminent winter season, I would like to request a completion date of 1 June 2011 for this order. <br /> It is not our intention to stop all work during the winter months, but we would like to have the flexibility to avoid the worst <br /> conditions. <br /> Thank you for your help. <br /> ......................................................................... <br /> Bill Schmitt dsi750Cc�juno.com <br /> 750 N. Arm Dr. <br /> Mound, MN 55364 tel&fax: 952 472-3033 <br /> Mortgage Rates Hit 2.67%I <br /> If you owe under$729k you probably qualify for Gov't Refi Programs <br /> http://thirdpartyoffers.iuno.com/TGL3141/4cd463496f9762eb4cm02vuc <br /> 1 <br />