Laserfiche WebLink
o�'��o <br /> Principal Dwelling Demolition Permit <br /> '�, � ��' ZONING DISCLOSURE & DECLARATION <br /> �o� <br /> To the property owner: Demolirion of the principal dwelling structure on a <br /> property may automatically terminate certain rights which may have accrued to the property by virtue of the <br /> continued existence of that building. <br /> >Rebuilding on a substandard lot of record(i.e.a lot that does not meet the zoning district required lot area <br /> or width standards) will, with few exceptions, require ��a:iance approval by the City Council, and such <br /> approval is not automatic nor guaranteed but requires that a hardship be demonstrated. <br /> >Additionally, all current zoning standards will have to�met by the new principal dwelling including <br /> setbacks, lot coverage by structures,hazdcover(impervioi:s surface), height limits, etc. <br /> >Where municipal sewer is not available, provision of nvo (2) sites for a conforming on-site sewage <br /> treatment system is mandatory. <br /> >Unless specifically approved by the City,all accessory strzctures must be removed at the time of principal <br /> dwelling demolition. <br /> The following information is presented for the purposes of advis�;the property owner ofthe implications ofremoval <br /> of the rinci al dwellin on the ro e <br /> 1. Property Address � � �� 1� s II�S# �i�'��� - 23 2 f DDD� <br /> 2. Zoning District��"�g Required Lot Area ►� .¢� Required Lot Width /L/0, l ��J <br /> ► � <br /> Actual Lot Area � �p � Actual Lot Width 3 � .� <br /> Lot azea variance is/is not required. Lot width variance is/is not required. <br /> i <br /> 3. Required Setbacks: Front =— Rear �— Side1� Side Street�i� <br /> i � <br /> Lakeshore Lot: Lake(Front) �� Street(Rear) 3 S <br /> Average Lakeshore Setba : must be met is not a licable. <br /> 4. Lot Coverage by Shucture limited to 15%of lot area/\ es not a 1 ot area>2 acres <br /> 5. Hardcover limitatio : are a licable%` re not a licable. t�-75'zone= 0%allowed <br /> 75-250'zone=25%allowed 250-500'zone=30%al'_owed 500-1000'zone=35%alIowed <br /> 6. �Municipal sewer is available. Municipal sewer is not a:-ailable;on-site system testing and design must be <br /> provided confirming th2:two conforming drainfield sites aze a��ailable. <br /> The un roperty owner hereby acknowledges receiFt of the above information. Staff Initials <br /> - �' aa - QY <br /> Property Owner's Signature Date <br /> (Original: Street File; Cop�: Property Owner) <br />