My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-general approval
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
780 Lakeview Parkway - 06-117-23-43-0021
>
Septic
>
septic design-general approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:14 PM
Creation date
4/24/2017 2:03:03 PM
Metadata
Fields
Template:
x Address Old
House Number
780
Street Name
Lakeview
Street Type
Parkway
Address
780 Lakeview Pkwy
Document Type
Septic
PIN
0611723430021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V��I G�t 1 <br /> � a��roUa / Qe•z / ✓t ��C� �'r'na� p�eS' t� 7 <br /> s <br /> a f- 1D�v' ��f��s' /z�i �l�C G r��u.� � �,�m�.e n <br /> ��� � � .�°� ���.� <br /> ��������� <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> .Iosep6 J. Olson--MPCA License#810 <br /> 11481 River-ti�ieH� Rd. NE, Hanover, MN 553�1 <br /> (763) 498-8779 Fax (7b3) 498-8290 <br /> December I�1, 2016 <br /> Gonvea Homes <br /> 780 Lakeview� Park�s�ay <br /> Orono. Hennepin Count�- <br /> This on-site Sewa�e Treannent System is designed for a Type l,five bedroom home in accordance with the <br /> Minnesota Pollution Control Agenc��Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 22-26 inches(mottled soil). Due ta the periodically <br /> saturated soils, a pressurized mound s��stem �+•ith 6 inches of rock will need to be installed to treat the septic <br /> effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This s�•stem <br /> is designed with b inches of rock. � <br /> The soils at a depth of 1?" have a percolation rate averagina 9.9 MPI. <br /> A 22�0 gallon septic tanks needs to be installed. All tanks need to be insulated if there is less than two feet <br /> of cover o��er the top of the tanks. Clean outs must be installed on the end of the laterals for maintenance. <br /> Use 7;32 inch perforations on the laterals. <br /> A 1300 aallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br /> power suppl� and s���itches must be located outside the manhole and pumping chamber in a weatherproof <br /> enclosure. A ���arning device must be installed with lijht and sound devices; this is in case of a pump <br /> failure. A flow measurement device must be installed. Including but not limited to a water meter,event <br /> counter, runninQ time clocks or electronically controlled dosing. <br /> Kee�all heavv equi�ment off of the oroposed treatment areas before durin�and after construction <br /> The area araund both sites must be fenced off bv the contractor before anv constructian be�ins <br /> With proper installation and maintenance,this s��stem should have no problem in treating septic effluent <br /> effectively. Nothine other than era� �+�ater.(laundry, showers,etc.) Human Nater and toilet tissue should be <br /> disposed of into the septic tanks. Garbage disposals are not recommended. Additives must not be used they <br /> may cause harmful damage to your septic system, ft is recommended that you pump the septic tanks every <br /> two vears. <br /> Sinc <br /> . <br /> Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.