My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-general approval
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
725 Lakeview Parkway - 06-117-23-34-0008
>
Septic
>
septic design-general approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:27:29 PM
Creation date
4/19/2017 1:17:50 PM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
Lakeview
Street Type
Parkway
Address
725 Lakeview Pkwy
Document Type
Septic
PIN
0611723340008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
����a c��� ����, �� <br /> vh41`���J;�r�f. <br /> ��en��`a� 4��rmva( ��1� nc�� �'c:,.� d,es�fn �n� �e�,►��-� a iE.�.^Ko� <br /> CITY OF C2G":p <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Josep6 J.Olson--MPCA License#810 <br /> 11481 Riverview Rd.NE,Hanover,MN 55341 <br /> (763)498-8779 Fax(763)498-8290 <br /> January 9,?017 <br /> Swanson Homes <br /> 725 Lakeview Parkway <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type l,five-bedroom home in accordance with <br /> the Minnesota Pollution Conrrol Agency Chapter 7080 and focal ordinances. <br /> The periodically saturated soils were located at 16-24 inches(mottled soil).Due to the periodically <br /> saturated soils,a pressurized mound system with 6 inches of rock will need to be installed to ueat the septic <br /> el�luent.The bottom of the treatment area must be located at least 3'above the saturated soils.This system <br /> is deslgned with 6 inches of rock <br /> The soils at a depth of 12"have a percolation rate averaging 8.4 MPI. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the[anks.Clean outs <br /> must be installed on the end of tha laterals for maintenance. <br /> Use 7r32 inch perforations on the laterals. <br /> A 1300 gallon pumping chamber will need to be installed to lift the effluent ro the treatment azea.The <br /> power supply and Switches must be located outside the manhole and pumping chamber in a weatherproof <br /> enclosure.A warning device must be installed with light and sound devices;this is in case of a pump <br /> failure.The manifold and supply line must have back drainage to the pumping chamber. <br /> KCCD eIl IIE9W COuinment p(f Of tI1C DfODOterl trantmpnt o�nsQ be�ore d« <br /> I�Q 8�d 8f[EI`Cnn�trurtin <br /> The area around both sltes must be tenced oftbv t6e coetractor betore aev �nctrurfinn bes�;n� <br /> With proper installation and maintenance,this system should have no problem in treating septic ef�luent <br /> ett'tctively.Nothing other than gay water,(laundry,showers,etc.)Human water and toilet tissue should be <br /> disposed of into the septic tanks.Garbage disposals are not recommended.Additives must not be used they <br /> may cause harmful damage to your septic system:It is recommended that you pump the septic tanks every <br /> two yean. <br /> Sincerely. <br /> ��--- <br /> �/ % _--._--- . <br /> `-_ `� Joseph 1.Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.