My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
180 Kintyre Lane - 32-118-23-43-0018
>
Septic
>
septic design-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:58 PM
Creation date
4/12/2017 11:49:47 AM
Metadata
Fields
Template:
x Address Old
House Number
180
Street Name
Kintyre
Street Type
Lane
Address
180 Kintyre Lane
Document Type
Septic
PIN
3211823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />� �o � <br /> � `� � �rF `-�'`' � _ �� <br /> .�� , <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License #810 <br /> 11481 Riverview Rd. NE, Haaover, MN 55341 <br /> (763) 498-8779 faz (763) 498-8290 <br /> November 03,2005 <br /> Bohland Development <br /> Proposed Lot 1,Block 2 Mackinnon Hill <br /> Orono,Hennepin.County <br /> This on-site Sewage Treatment System is partially designed for a Type 1,five-bedroom home in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> Once the house size,location and sepric site are chosen this design can be completed. <br /> The seasonally saturated soils were located at 18"-34"(mottled soil). Due to the seasonally saturated soils, <br /> a pressurized Mound System will need to be installed to treat sepric ef�luent. The bottom of the treatment <br /> area must be located at least 3'above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 6 MPI. <br /> AII absorption areas are at a minimum of 20 feet from the lot lines and 75 feet from wetlands. <br /> A pumping chamber will need to be installed to lift the ef�luent to the treahnent area. The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with a light and sound device;this is in case of a pump failure. <br /> Keep all heavy equipment off of the proposed treatment areas before and after construction. The <br /> treatment area must be fenced off before construction begins. This Design is not valid&the System <br /> wiil need to be relocated if failure to protect the areas proposed for the On-Site Sewage Treatment <br /> systems occurs. <br /> Nothing other than gray water,(laundry,showers,ect.)human water&toilet tissue should be disposed of <br /> into the septic tanks. Garbage disposals are not recommended. Additives must no be used,they may cause <br /> harmful damage to your septic system. It is recommended that you pump the septic tank every year for 1 <br /> tank,every two years for two tanks. <br /> Sincerely, <br /> Joseph J.Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.