Laserfiche WebLink
�� °�'� , <br /> o : o <br /> :::�:::k:; cITY of URUNO <br /> ,.,,V't'., Mr. <br /> '� tP,���r';yl�x� - �, Municipal Offices <br /> �\�� �'�+�@��`''v,f.k��-���`?�� G~ <br /> 1��,;.,����r���� , Street Address: Mailing Address: <br /> ���9 r"����'' �'4��% 2750 Keiley Parkway P.O. Box 66 <br /> �`� kE3I;� i <br /> ��—� Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner ofAddress / O $O Ki�.oJ( �-��o � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The.onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes � � <br /> �- <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in refena.l to the City Attorney for <br /> legal action. <br /> System Identif�d'as Non-Compliant <br /> Yes +� <br /> No <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 � � <br /> December 31, 2010 � <br /> Other ' <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every t ee years. City records indicate the tank(s) were last pumped out on <br /> �j- (�U`'� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> ���� ���� <br /> Inspector: Date of Inspection � ��� <br /> Telephone(9�2)249-4600 • Fax(9�2)249-461h <br /> www.ci.orono.mn.us <br />