Laserfiche WebLink
� � \, ` � <br /> � �i <br /> �, o\`,\� <br /> `:��:{�:::.�. �'i��� O� �'���� <br /> �� ,"7 - ►'�.r <br /> �,�, ���� � ,r�"j � �;;., � Municipal Offices <br /> ;��{).� '��,i'�;,�;.`;";=a,i;�;I� ti, <br /> �����"�'� ��>��'�"•{���- G �' Street Address: Mailing Atldress: <br /> � �1��.:�<:.�..�,... ., <br /> ��, � .. �� ; <br /> �,'�•q ��"'��''' '¢�ii` 2750 Kelley Parkway P.O. Box 66 <br /> ��- kE$H�� i% Crystal Bay, MN 55323-0066 <br /> ;� Orono, MN 55356 <br /> To: Tlze Cunent Owner of Address <br /> �?�� �l c� t C.�� �.� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Thi-eat <br /> Yes _� <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within l� <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in refenal to the City Attorney for <br /> le�al action. <br /> System Ident�ed as 1\Ton-Compliant <br /> Yes �1tiTo <br /> If yes, system must be brouaht into compliance by: <br /> December 3I, 2007 � <br /> December 31, 2010 , <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �._ „� �.-�(:� . The tanl:(s) should be cleaned through the mailhole and <br /> not throu�h the inspection pipes, tlus allows for proper c.leanin�. <br /> Comments: <br /> �.. <br /> Insp�.� � � a � � .���� � Date of Inspection �`� � <br /> � <br /> Telephone (9-2)249-4640 ° Fas (9�2i 249-4616 <br />