Laserfiche WebLink
� �\ <br /> �,\;� <br /> � <br /> �, O\\, <br /> :�;�>,t�;;;:.�.;:�.._. ���� O� ����� <br /> ;:��... �::,. . <br /> � ��v{A ��Ar'{;' _ �+' Municipal Off'ices <br /> �t't �'i, ,� + a°v� �°i; I . ,�. <br /> '' � '"' �'�"�'•' ����"k'��°'�'`* G �� Street Address: Mailing Address: <br /> `�;,. ,� 1�.';;:.F�:��s!.;,s�;�'�.� ;; P,O, Boz 66 <br /> �:�qkESK�g��' 2150 Kelley Parkway <br /> '�� Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Cunent Owner of Address ,��� l�a t ��� � � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the following is known about tlie system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. � <br /> Imminent Public Health Thl-eat <br /> Yes <br /> No � <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identif'ie s Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance bq: <br /> December 31, 2007 -��� <br /> December 31, 2010 , <br /> Other <br /> Septic Tank � Pump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every tkuee years. City records indicate the tank(s) �vere last pumped out on <br /> �.. �� �;� . The tank(s) should be cleaned throuQh the mailhole and <br /> not through the inspection pipes,tlus allot�s for proper cZeanina. <br /> Comments: <br /> � � <br /> Inspector: Date of Inspection <br /> C�� - u�� <br /> Telephone (9�?.13��-4600 • Fas (��2.�2=#9-461( <br />