My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-1997 Council Minutes Neighborhood Meeting Highway 12
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1997
>
05-27-1997 Council Minutes Neighborhood Meeting Highway 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:33:55 PM
Creation date
9/27/2012 3:33:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />Is WEST NEIGHBORHOOD MEETING <br />CONCERNING THE HIGHWAY 12 DESIGN <br />MAY 27,1997 <br />The meeting was called to order at 6:30 p.m. by Mayor Jabbour. Jabbour indicated the location of <br />the corridor for an upgrade of Highway 12 has now been selected. The next step is to develop a <br />preliminary design for the roadway within the selected corridor. This is being done with input from <br />representatives of the cities and other governmental agencies affected by the project. These <br />representatives are serving on a Preliminary Design Committee. The role of the committee is not <br />to change the corridor but rather to minimize the impacts of the roadway on affected property <br />owners. Jabbour indicated the Preliminary Design Committee and the City Council need the input <br />of the property owners along the corridor to ensure the design process addresses the concerns of the <br />affected property owners. <br />Jabbour indicated the city has divided the corridor area into two neighborhood areas. The west <br />neighborhood area includes all properties west of Willow Drive. The east neighborhood area <br />includes all properties east of Willow Drive. The city would like to form a neighborhood committee <br />from each of the two neighborhood areas to provide input to the Council and to the city's <br />representatives on the Preliminary Design Committee regarding the design of the roadway. There <br />will be approximately 5 representatives on each of the neighborhood committees. The purpose of <br />the neighborhood is to serve as a communication channel between the city and the neighborhood <br />to keep the neighborhood up -to -date on the progress of the Preliminary Design Committee, and to <br />obtain input from the neighborhood regarding the preliminary design. <br />Allen Engleman asked why the corridor could not be moved to the north versus to the south since <br />there are no houses to the north side of the corridor. Jabbour indicated the corridor has to stay south <br />of the St. George cemetery. Because the rail road can only have minimum curves, it requires a long <br />distance to move the corridor farther to the north on the west side of the cemetery. <br />Chuck Guerin, of Flamingo Wire, asked for clarification of where the corridor is located. Jabbour <br />indicated the corridor is located along the current Burlington Northern Rail Road corridor. He <br />explained the current east/west road system including new Highway 12. He indicated the new <br />Highway 12 will be a two lane freeway which will be the most effective traffic mover in the State. <br />Mr. Guerin asked what the time table for the Highway 12 project is. Goetten indicated the <br />Preliminary Design Committee is working with Mn/DOT to complete the preliminary layout of the <br />roadway by the 1997 but that the committee is scheduled to continue to meet for approximately 3 <br />to 4 years as the details of the design are finalized. Jabbour indicated that Mn/DOT is in the process <br />of completing an environmental assessment on the project which is to be completed in early 1998. <br />The EA process is to determine whether an environmental impact study is needed. <br />Roberta Morrison asked how far south the new right -of -way will be from the current right -of -way. <br />. Moorse indicated that west of Willow the new right -of -way will generally be approximately 35 feet <br />south of the current right -of -way. Morrison then asked when the new road will be built. Jabbour <br />
The URL can be used to link to this page
Your browser does not support the video tag.