My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
sewer info
Orono
>
Property Files
>
Street Address
>
E
>
East Long Lake Road
>
430 East Long Lake Road - 35-118-23-14-0005
>
Correspondence
>
sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:57 PM
Creation date
7/11/2016 12:41:20 PM
Metadata
Fields
Template:
x Address Old
House Number
430
Street Name
East Long Lake
Street Type
Road
Address
430 East Long Lake Road
Document Type
Correspondence
PIN
3511823140005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_�� <br /> � � 0,�,.yv <br /> � <br /> 0 0 <br /> ,� <br /> � �,. � CITY of ORONO <br /> � ,� `��� �� ��, % Municipal Offices <br /> ����,� `-���`���� Street Address: Mailing Address: <br /> �'��kESH��� 2750 Kelley Parkway P.O. Boz 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> November 3 , 1999 <br /> Russell S. Sturman <br /> 430 East Long Lake Road <br /> Wayzata, MN 55391 <br /> Dear Project Area Residents: <br /> The East Long Lake area was included in the recently completed Metropolitan Urban Service Area <br /> (MUSA)expansions. This MUSA expansion area included ten existing neighborhoods with smaller <br /> lot sizes in which the continued use of septic systems could be problematic. Sanitary sewer has <br /> already been installed in seven of these neighborhoods with two additional projects planned for next <br /> summer. <br /> We would like to begin the process for a possible sanitary sewer project to serve the East Long Lake <br /> neighborhood. This would be an assessment project with the benefitting property owners being <br /> assessed the project costs. <br /> A preliminary cost estimate has been completed for this project. The study lists two possible options <br /> for the provision of sanitary sewer. One option is for gravity sewer with a City owned lift station. <br /> This is the more expensive option because of the need for deeper 8" gravity lines and the need for <br /> complete reconstruction of the street. The estimated cost for the gravity sewer option is$31,000 per <br /> unit for ten residential units and one unit for the city park. A service stub would be provided out to <br /> the property line and the property owners are then responsible for their own connection to the stub <br /> at the property line. <br /> The other option is for a pressure sewer system in which a small diameter forcemain would be <br /> installed in the street. The properiy owners are then responsible for the purchase, installation, <br /> operation,and maintenance of their own residential grinder pump station to pump into the forcemain. <br /> A City owned lift station is not required for this option. This option is less expensive because a <br /> smaller diameter forcemain can be installed at a shallower depth and complete street reconstruction <br /> is not required. The estimated cost for this option is $13,700 per unit. <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.