Laserfiche WebLink
� <br /> ��` <br /> �j�� �\'\� <br /> �� o\\;\` <br /> � :;,:; - _ `� ��T�' of 4RUl1a� <br /> � � �� �- _ ��1 <br /> , � MunicipalOffices <br /> , r ., � <br /> � � <br /> u , r <br /> �� " '/ <br /> ti� <br /> �`�.'� ��i,''` � .`�;�,` � �% Street Address: Mailing Address: <br /> �' � ` '��%� P.O. Box 66 <br /> �; 9 4� 2150 Kelley Parkway Crystal Ba MN 55323-0066 <br /> ..,,$E3�I� �%' <br /> `��� Orono, MN 55356 Y, <br /> To: The Current Owner of Address ���� ��P J�r`�� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewaje treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days af receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> r10 �Y <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �'" <br /> No ✓ <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> � (r,-� j . The tanl:(s) should be cleaned through the manhole and <br /> not throuah the inspection pipes, this allows for proper cleanin�. <br /> Comments: <br /> ���. ��� <br /> Inspecto::"��� <br /> Date of Inspection � � � <br /> Telephone(9�2) 249-4600 • Fa� (9�2)2�9-4616 <br />