My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
300 Brown Road South - PID: 03-117-23-13-0002
>
Septic
>
Septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:30 PM
Creation date
2/1/2016 3:28:38 PM
Metadata
Fields
Template:
x Address Old
House Number
300
Street Name
Brown
Street Type
Road
Street Direction
South
Address
300 Brown Rd S
Document Type
Septic
PIN
0311723130002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ; o� <br /> �. � <br /> . ,-- o o�;, <br /> �� i: , CITY o� �RO1�T0 <br /> ,��,+:;r;�., � <br /> � '1'� ;y�,: ',r�,_. ,. �, ,' Municipal Offices <br /> � 1%. ,� : ti, <br /> , ';t:i,; '`�-;;� G Street Address: °ISa-a49-�"16� 0 Mailing Address: <br /> �'9x � xp4�� 2750 Kelley Parkway P.O. Box 66 <br /> � Orono, M N 5 5 3 5 6 C ry s t a l B a y, M N 5 5 3 2 3-0 0 6 6 <br /> To Current Owner: Address: ��� �a w" Y`-� ' S J <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYST'EM CONFORMITY (1-3): � <br /> - 1 "CODE SYSTEM" An ISTS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the current Orono <br /> Municipal Code but does meet the three foot separation requirement or two foot requirement for systems installed 1996 or earlier,and <br /> which is not failing or an imminent threat to public health or safety. <br /> "NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> or may not meet all the location,design,or construction stanc�rds of the current Orono Municipal Code and which is failing for any <br /> reason;and any IS'I'S with less than three feet of unsaturated soil or sand between the distribution device and ihe limiting soil characteristics. <br /> TANK CONDITION(5-7): S' <br /> Tank inspection indicates: <br /> �51 Pumpout not needed at this time. <br /> � Septic tanks must be pumped out this year (city code recommends tanks to be pumped out once every 3 years. <br /> Tank was last pumped ��-\—0\ ). <br /> Make sure septic tanks are pumped through manhole and not throu�h white inspection pipes. This allows for the proper <br /> cleaninS Keep water softner and iron flter discharee out of septic svstem to prolone life of drainfield. Ask pumper to test <br /> alarm float to verifv alarm is still workin�in vour house The alarm warns owner that septa�e is about to backua into basement. <br /> 7 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be mstalled m each tank. If <br /> tanks have not been pumped out within the last three years,they should be pumped out now. <br /> DRAINFIELD CONDITION(8-10): � <br /> 8 Drainfield is dry,no surfacing evident. <br /> 9 Some evidence'of surfacing,not critical yet. <br /> 10 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br /> immediately.Repairs must be completed within 90 days. <br /> COMMENTS• I���:�.�;e1J iS �dc�— Ca�I���.-)- �- ;..t`�.us�- �� <br /> ccQ���<<d �� �t-�� - 2��� <br /> �2� -U� G� <br /> Date of Inspection Matt Bolterman - Septic System Inspector <br /> Note: ln tl�e event that [his inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that this report does <br /> not guarantee or ceRify that an existing system will continue ro function properly. but is mercly an opinion of the adequacy of the system under current <br /> conditions based on the available iniomiation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.