My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-3998 PLat Resolution ExC
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1400 Bracketts Point Road - 11-117-23-32-0025
>
Land Use
>
18-3998, VAC
>
2-26-18 CC Meeting
>
Plat Reso
>
18-3998 PLat Resolution ExC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 1:39:47 PM
Creation date
3/19/2026 1:39:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H:\ORNO\C13115486\z-18-3999_Brackets Point\Southways_PrePlatReview-1_2018-01-09.docx <br />January 9, 2018 <br />City of Orono <br />Attn: Jeremy Barnhart <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />RE: Preliminary Plat Application 18-3999 <br />Southways Addition <br />Engineering Review #1 <br />Dear Jeremy: <br />As requested, I have completed an engineering review of the documents submitted for the above <br />referenced project. In addition, Adam Edwards has provided comments for inclusion with this review. <br />We offer the following observations, comments, and recommendations for your consideration: <br />1.0 GENERAL: <br />1.1 Stormwater management for the site to meet regulatory requirements is proposed through use <br />of wet retention basins. The following should be considered regarding the proposed system: <br />a.Volume control and water quality measures must be provided as well to meet NPDES <br />requirements. Plans should be revised to include volume reduction equal to 1” of runoff <br />from the new impervious surface. If infiltration is considered infeasible, other methods of <br />volume reduction must be considered. It appears that there are sufficient areas high <br />enough above the water table to provide localized filtration practices or amended soils. <br />Also, the overall estimate of Total Suspended Solids (TSS) and Total Phosphorus (TP) <br />from proposed improvements must be reduced from pre-project conditions. Calculations <br />detailing volume control and water quality compliance must be submitted for review and <br />approval. If the applicant pursues a design with less than the normally required infiltration <br />volume, sequencing of design to provide treatment to maximum extent practical must be <br />provided. <br />b.An Outlet Control Structure (OCS) that provides skimming must be installed on the wet <br />retention ponds in order to keep floatables in ponds. The following should be considered <br />regarding OCS design: <br />i.The inlet pipe from the pond to the OCS should be submerged with back slope from the <br />OCS to the pond to facilitate maintenance. The normal water level should be <br />controlled by a weir in the structure or the outlet pipe. The inlet pipe should be one <br />nominal size larger than the outlet pipe to limit flow control and turbulence at the pond <br />interface. <br />ii.A sloped rim should be utilized, per City Standard Details, with the bottom of the rim <br />placed at the predicted 100 year high water level. <br />iii.A trashguard should be installed on the outlet pipe. <br />c.Wet retention basins must provide a minimum 1800 cubic feet per acre of drainage area. <br />The stage-storage curves for permanent pools must be submitted for review to verify <br />Resolution Exhibit C
The URL can be used to link to this page
Your browser does not support the video tag.