My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA18-38 ExB Amendment 2
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1400 Bracketts Point Road - 11-117-23-32-0025
>
Land Use
>
LA18-000038, Final Plat
>
CC 10-28-19
>
LA18-38 ExB Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 12:24:57 PM
Creation date
3/19/2026 12:24:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Agreement <br />Amendment #2 <br />Southways <br />October 28, 2019 <br /> <br />TIME OF PERFORMANCE. The Developer shall should install all Improvements as contemplated by <br />Section 8 and the approved Plans by December 31, 2019, with the exception of the final wear course of <br />asphalt on streets. The final wear course on streets shall be installed between May August 15th and <br />September 15th the first summer after the base layer of asphalt has been in place one freeze thaw <br />cycle. The Developer may, however, request an extension of time from the City Engineer. If an extension <br />is granted, it shall be conditioned upon updating the "security" to reflect cost increases and the <br />extended completion date. Final wear course placement must have the written approval of the City <br />Engineer, and may be delayed or scheduled at any time of the year based upon existing site conditions <br />at the discretion of the City Engineer. <br /> <br />Approved by the City Council _____________
The URL can be used to link to this page
Your browser does not support the video tag.