Laserfiche WebLink
cc*>f^o coPy <br />dTT OF OROHO <br />SEPTIC SYSTEM EFFROyEL <br />PeZBit <br />Pee $___ <br />Entered By <br />The General Contractor will be given a copy of this report and is <br />responsible for its distribntioa to all snb-contractors. Septic system <br />design is not considered as approved unless this sheet is attached. <br />xocMicffl: ’TjgP/*- <br />CTwg»«Ti cQiiraACiOR; ^Oi»ttr'S ^'y?~ZSO^ <br />SEPnC CORIllACTORs___________________________________ PHOKEs____________ <br />OfWgB; lA>Jt:>l»¥C.M\LU. <br />^MsAPPROVZD , , ^ <br />□ CONDITIONMiy ASraOVED^j^Note^ IJ <br />COMMEHTS sJ'^^A'O^ )S(00 - f'Z^O ^ <br />5choi=> ^ |gOC4iiL&gt\ . <br /><’P 4’g^ST7/^<j> <br />Both pZ)MAP>'f <br />C/ge-- ^/res._____________ <br />notice to IKSTALLERS: Any changes to the approved plan zmd specs must have <br />prior approval of the Inspector (473-7357). Call for inspections 24 hours <br />in advance. <br />CB TO GlgNKiKAi» CONTRACTORS: Drainfield sites must be protected prior to <br />.na after system installation to avoid compaction of the natural soil, <br />rainfield areas must be fenced off to eliminate all traffic over them. <br />-90 <br />Date Approved