Laserfiche WebLink
CITY OF ORONO <br />Permit J <br />SEPTIC SYSTEM APPROVAL <br />Fee $ <br />Entered By <br />The General Contractor will be given a copy of this report and is <br />responsible for its <br />OtAS APPROVED UNLESSuTHIS SHEETtISsATTACHEDC SYSTEM <br />DESIGN IS NOT CONSIDERED <br />LOCATION: a -7 <br />PHONE ::/L <br />GENERAL CONTRACTOR: <br />PHONE: <br />SEPTIC CONTRACTOR: <br />PHONE: <br />ONNER: <br />Q APPROVED <br />_CONDITIONALLY APPROVED: <br />COMMENTS: 1 IO��Il _g <br />(Note Changes Below) <br />M <br />gg a l <br />NOTICE TO of INSTALLERS: Inspector (y73 angel Call for inspe tions 24 hours'in advance have prior <br />PPthe <br />NOTICE TO GE1fERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br />prior to and after system installation to avoid compaction of the natural soil. <br />ALL DR)IIAFIZ�LD AREAS Mass building Opp prior to building site excavation and fencing must <br />remain in place until final site grading. Approval to pour footings will not he granted <br />until the Inspections Department has verified that primary and alternate sites are <br />adequately protected. <br />th <br />owed <br />NO VEHICULAR TT tested drainfield drainfie dZaiteaa either cbeforeror aft rg system econstruction. <br />This <br />within 2t of <br />applies to the lot you are working on and all adjacent lots. You could be held liable for <br />damaging sites on neighboring lots. <br />I{PACTZOH, RENDERING DRAZ1iPIELD SITES UNUSABLE' <br />VEHICULAR TRAFFIC CAN CAUSE SOIL CO <br />Evidence of traffic on drainfield sites may be cause for revocation of buildingpermits. <br />Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br />���1/ By City o rono <br />Date Approved <br />