My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-06-14 Application for Septic Permit
Orono
>
Property Files
>
Street Address
>
C
>
Cox Farm Road
>
1050 Cox Farm Road - 27-118-23-32-0017
>
Misc.
>
1994-06-14 Application for Septic Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 4:22:24 PM
Creation date
4/23/2025 4:20:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br />Box 66 (2750 Kelley Parkway) <br />Crystal Bay, MN 55323 <br />JOB SITE ADDRESS: 0.5-6 Ca,c F IQ�I <br />Occupancy Type: Residential ✓ <br />New or Replacement System, <br />Repair Existing System, <br />0.50 State surcharge added to above fees <br />*See fee schedule for non-residential permit fees <br />Owner's Name: T C PhoneNumber. YL y -38 7- <br />Mailing Address: City: Zips <br />Contractor's Name: Pbone Number: 4 71- <br />Mailing Address: 26 3 City: �,,,, . sr Tip: <br />DO NOT MAIL PAYMENT WITH THIS APPLICATION <br />GENERAL INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />Offices; however, permits will not be mailed out. The permit must be picked up in <br />person at the City Offices and work must not begin unless the permit card is on the job <br />site. <br />All work must be done in accordance with the approved septic sysL a design. Design <br />reports are not considered approved unless accompanied by the "City of Orono Septic <br />System Approval" cover sheet signed by the City Inspector. <br />The following inspections will be required for all septic systems: <br />A. Pre -installation site inspection to include inspector, installer, and general contractor. <br />B. Tank installation prior to covering. <br />C. Drainfield trench installation prior to covering. For mounds, inspection is required <br />after rough -up but prior to sand placement (sand will be jar tested for silt content), <br />_4W again during pressure distribution piping installation in the rock bed. <br />D. Final inspection to verify proper final cover depths and to verify that all pump station <br />(where required) components are functional and comply with codes. <br />Individual holding MPGA Installer Certificate shall be present during inspections <br />hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.