My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-21 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive West
>
2760 Countryside Drive West - 04-117-23-12-0011
>
Septic
>
1993-12-21 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:20:40 PM
Creation date
4/16/2025 3:48:16 PM
Metadata
Fields
Template:
x Address Old
House Number
2760
Street Name
Countryside
Street Type
Drive
Street Direction
West
Address
2760 Countryside Drive West
PIN
04-117-23-12-0011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S -P TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />December 21, 1993 <br />Dickey site <br />Lot 3, Block 2 <br />Orono, Henn. Co., MN <br />This On -Site Sewage Treatment System is Designed for a Type 1, five <br />bedroom home in accordance with the Minnesota Pollution Control <br />Agency Chapter 7080 and local ordinances. <br />The soils on this site are SCS soils mapped - LrC - Lester loam. <br />A seasonally high wa-zer table was located at 12" to 28", (mottled <br />soil). Due to the seasonally high water table, a Pressurized <br />mound System will need to be installed. The bottoin of the rock <br />bed must be located at least 3' above the seasonally high water <br />table. <br />The soils at a depth of 12" have a percolation rate averaging <br />8.9 min/inch. <br />A pumping chamber will need to be installed to lift the effluent <br />to the tr;,r,tment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material are clean. The sod layer below the <br />entire mounded area must be turned over, just break up the sod, be sure <br />not to over work. <br />The power supply and switches must be located outside the manhole and <br />pumping chamber in a weather proof enclosure. A warning device must <br />be installed with a light and sound device, this is in case of a pump <br />failure. Mercury floats are a good method. <br />All neighboring wells are located greater than 100' away from the <br />proposed treatment area. <br />CONT'D <br />
The URL can be used to link to this page
Your browser does not support the video tag.