Laserfiche WebLink
M-« - M.'1 <br />ON-SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />Ow //»<* North Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 56323 <br />473-7357 <br />_ M <br />I <br />OWNER ADDRESS /fi" //J Jo <br />PERMIT NO.'S.DATES CONTRACTORS <br />City Ordinance No. 210 requires that each on-site sewage treatment system in Orono be inspected on a regular basis. The on-sita <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />IThis is 0^n existing system □ new construction) <br />pn ^ Meets or exceeds current City standards in ail respects relating to design, construction, and location. Appears to be operalifif <br />properly. <br />02 <br />□ 3 <br />Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be desipfied. <br />located, and constructed generally in accordance with previous codes. System appears to be functioning property; no msior <br />upgrading of the system is required at this time. <br />Does not meet current City standards in many respects relating to design, construction, or locaiton. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />04 System may or may not meet current City standards for design, construction or locaticn. but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters. Or it <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuas system repair/ <br />replacement procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( (21 Checked items may require your action) <br />k inspection indicates: <br />□ Pumpout not needed at this time. <br />□ Solids accumulation in tanks indicates they should be pump­ <br />ed out this year to help prevent future problems. <br />O Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />□ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />□ Inspection risers missing-tanks could not be inspected. <br />Inspection risers (4" die. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />□ Inspection pipe is located directly over tank baffle. lOoae not <br />give accurate measurement of solids accumulation.l If tanks <br />have not been pumped out within the last three years, thay <br />should be pumped out now. <br />Drainfield inspection indicates: <br />- - Q Drainfield is dry. no surfacing evident. <br />□ Some evidence of surfacing, not critical yet. <br />□ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace­ <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />□ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />□ Slope <br />□ Soil <br />□ High water table <br />□ Lot sire <br />□ Lake, wetlaftd, or stream <br />□ Drainage <br />Potential for System Failure <br />(depends on soil types, water <br />table, and system condition) <br />□ Low <br />Q Medium <br />□ High <br />0 System is causing visible <br />surface discharge. <br />Site Capabilities for <br />Future Expansion <br />-----O Adequate <br />G Fair <br />□ Poor <br />O Inadequate <br />COMMENTS <br />J CY__111 ____LlL ^k <br />Date of Inspection ]Septic System Inspector <br />Note In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report must be kept on the premises with system location and pumping records. <br />WHITE COPY / Inspector’s File GOLD COPY / Homeowner