My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SE23-000003 IR
Orono
>
Property Files
>
Street Address
>
L
>
Lillian Lane
>
2910 Lillian Lane - 33-118-23-31-0016
>
Septic
>
SE23-000003 IR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 3:42:50 PM
Creation date
3/8/2024 3:42:35 PM
Metadata
Fields
Template:
x Address Old
House Number
2910
Street Name
Lillian
Street Type
Lane
Address
2910 Lillian Lane
Document Type
Permits/Inspections
Permit Number
se23-000003
PIN
2910
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION RECORD <br />PERMIT NUMBER S a3 — C>CM03 <br />MUST CALL TO SCHEDULE NO LATER THAN THE <br />BUSINESS DAY PRIOR TO THE INSPECTION DAY <br />8:00 A.M. TO 4:30 P.M. Monday thru Friday <br />952-442-7520 <br />Site Address: �•� r �c�� <br />Description: _ U Cw Mc."_j 55k-5 <br />Permission is hereby granted to: <br />Owner:G.�G��r`n <br />Contractor: �[ ra + r <br />To install or construct the improvements applied for. <br />This permit is granted upon the condition that the <br />person to whom it is granted, and his agents, <br />employees and workmen, shall conform in all respects <br />to the Ordinances of the Municipality of <br />ar-O'C:' and to the Statues of the <br />State of Minnesota in such cases made and provided, <br />this permit may be revoked at any time upon violation <br />of any of the provisions of said Ordinances, Statues, <br />or for any misrepresentation in the application. <br />This card and reviewed construction plans must be <br />posted at the worksite and maintained until all <br />inspections have been approved. NO INSPECTION <br />will be performed if card and plans are not available <br />to inspector. REINPSECTION FEE WILL BE CHARGED. <br />NO DEVIATIONS FROM THE APPROVED PLANS ARE <br />ALLOWED WITHOUT PRIOR CONSENT FROM THE <br />BUILDING INSPECTIONS DEPARTMENT. Do not <br />occupy until all final inspections have been <br />completed. <br />Permit expires when building and work is not <br />commenced within 180 days or if building and work is <br />suspended, abandoned or not inspected for 80 days. <br />Occupancy: <br />Construction: <br />REQUIRED INSPECTIONS <br />Note. Permit holder is responsible to call for these <br />inspections. <br />Notes:. .. 6LALI t loo ac)l.�' 7 <br />Required Inspections <br />Date <br />Inspector <br />Plan Review <br />—�'o-� <br />Soils Confirmation <br />C. <br />Scarification <br />mac) <br />C_ <br />Septic & Pump Tanks <br />-7 f Z <br />C <br />Rock bed/Laterals <br />Final <br />-71111� <br />Notes:. .. 6LALI t loo ac)l.�' 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.