Laserfiche WebLink
T0: Administrator <br />FROM Inspector <br />DATE: January R, 1971 <br />SUBJECT: Village Well Bids <br />I received two bids for a 4" well for the Village Hall. In order to <br />compare bids, I called Stodola if his included the dig -in and he said <br />it did. Ic is noted he charged m sn per foot for K copper and Stevens <br />52.25. The $1.25 Per foot compensates for the eig-in. The bids were <br />as follows: <br />Stevens 519951.00 <br />Stodola 1,ROn.on <br />