My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 - Homeowner Sewer Agreement
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
3440 Bayside Road - 05-117-23-13-0054
>
Misc
>
1991 - Homeowner Sewer Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:17:30 PM
Creation date
2/7/2023 2:49:10 PM
Metadata
Fields
Template:
x Address Old
House Number
3440
Street Name
Bayside
Street Type
Road
Address
3440 Bayside Rd
Document Type
Misc
PIN
0511723130054
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGRBBNBMT <br />Partiā¬8, This is an agreement by and between Todd Ziesmer <br />and Marie Ziesmer, husband and wife, (hereinafter "the <br />Owners") and the City of Orono, Minnesota, a Minnesota <br />Municipal Corporation, (hereinafter "the City"). <br />Recitals. <br />A. The Owners own property in Hennepin County, <br />Minnesota legally described in Exhibit A, attached <br />(hereinafter "the Property"). <br />B. This agreement is to amend the November 6, 1989 <br />Holding Tank Agreement whi.;h the Owners signed on <br />December 4, 1989, hereto attached as Exhibit B. This <br />amendment is for the purpose of allowing the Owners to <br />construct a trench-type drainfield as a temporary <br />supplement to the holding tank sewage system currently <br />in use. <br />C. This approval is not transferrable to a new owner. <br />3.Agreement of the Parties. The City and the Owners in mutual <br />consideration hereby agree as follows: <br />A. The City agrees to extend until July 1, 1992 the <br />Temporary Certificate of Occupancy previously granted <br />on March 1, 1989 and extended to September 1, 1990. <br />That Temporary Certificate will note the completion of <br />the septic system as a requirement for issuance of a <br />Pinal Certificate of Occupancy. <br />B. If no City Council decision has been made by July <br />1, 1992 regarding installation of municipal sewer, the <br />Owners agree to: 1) complete the mound drainfield <br />system within 60 days of that date, or 2) appear before <br />the City Council to request an extension of this <br />holding tank/temporary drainfield agreement and the <br />Temporary Certificate of Occupancy. <br />C. The City agrees to allow the Owners, at the Owners* <br />expense, to have a licensed septic system contractor <br />install a minimum site trench drainfield in the front <br />yard, as a supplement to the holding tank system. The <br />intent of such a drainfield system would be to treat <br />some portion of the sewage load on site, to minimize <br />the need for regular holding tank pumpouts. Such a <br />system, if installed, shall include an overflow holding <br />tank, 1000 gallons minimum capacity. The intent is <br />that whatever portion of the sewage load cannot be <br />treated by the drainfield system will overflow to the <br />holding tank for pumpout as necessary, thereby greatly <br />reducing the potential for surface discharge of sewage. <br />This drainfield/holding tank system shall be install^ <br />by a licensed septic system contractor, who shall be <br />responsible for obtaining the necessary permits. The <br />minimum standards and requirements for design and <br />construction of the drainfield shall be determined by <br />City staff in conjunction with the Owners. <br />Page 1 of 4
The URL can be used to link to this page
Your browser does not support the video tag.