My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 Septic system design and test report
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2340 Abingdon Way - 03-117-23-23-0015
>
Septic
>
1987 Septic system design and test report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:25 PM
Creation date
2/1/2023 11:49:51 AM
Metadata
Fields
Template:
x Address Old
House Number
2340
Street Name
Abingdon
Street Type
Way
Address
2340 Abingdon Way
Document Type
Septic
PIN
0311723230015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DESIGN <br />FOR EIOEN CONSTRUCTION <br />OF LOT 9, BLOCK I, ABINGDON GLEN <br />ORONO, MINNESOTA <br />11-5-87 <br />1. Percolation Rate, Type of System. <br />30.8 minutes per inch. Shallow Trench System with an interceptor draintile. <br />2. Proposed Flow Rate. <br />4 bedrooms @ 150 G.P.D. = 600 G.P.D. <br />3. Soil Treatment Area Needed. <br />Use 2.20 factor x 600 G.P.D. = 1320 Sq. Ft. <br />4. Size and Number of Trenches. <br />4 trenches 3 feet wide and 110 feet long = 1320 Sq. Ft. These trenches would <br />be spaced 7.5 feet apart center to center and be 0.5 ta 1.0 feet deep in the <br />natural soil. If 1.0 feet deep, the interceptor draintile would need to be <br />at least 3 feet lower than the bottom of the trench. <br />5. Drainfield Rock Needed. <br />44.4 cubic yards of rock is needed to have 6 inches under and 2 inches over <br />a 4 inch distribution pipe. <br />6. Septic Tanks. <br />Two tanks of at least 1000 gallons are needed. Depending on the final hous^ <br />elevation, it may be necessary to have a third pumping tank of at least <br />gallons. <br />7. All construction and materials must adhere to the provisions of the City of <br />Orono. All grading and construction traffic must be kept from both the pri <br />mary and the alternate drainfield sites. The interceptor draintile must be <br />at least 10 feet upslope from the highest trench. If any other information <br />is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg, ^ <br />PCA certified <br />ESS
The URL can be used to link to this page
Your browser does not support the video tag.